Case Study: 40-Room Boutique Hotel in Dubai Business Bay

How we delivered a complete GRMS solution for a 40-room boutique hotel in Dubai Business Bay. Mid-range DALI system, 4-month timeline, 32% energy savings.

Project Background

Location

Dubai Business Bay

Room Count

40

Type

New build boutique hotel

Timeline

4 months from order to commissioning

Client Requirements

  • Budget-conscious but quality-driven — the owner wanted premium guest experience without luxury-system pricing.
  • Must integrate with existing BMS — the building management system was already specified and the GRMS needed to communicate via Modbus.
  • Minimal wiring (pre-fab rooms) — rooms were pre-fabricated off-site, so the system had to work with limited in-wall cabling.
  • Touch panel in each room with 4 scenes — guests needed one-touch access to Welcome, Relax, Reading, and Night modes.

Our Solution

We recommended a mid-range DALI-based system with pre-commissioned RCU units to match the prefab construction approach.

ItemModel / SpecQty
RCU Main UnitDALI-2 RCU, 8-relay + 4-dimmer40 units
Touch Panel 4-scene7" LCD, flush-mount, PoE40 units
Occupancy SensorCeiling PIR + lux, DALI bus40 units
Door SensorMagnetic reed, NC contact40 units
RFID Card SwitchMifare, 48V output40 units
Curtain Motor ControllerDALI curtain module40 units
Floor GatewayModbus TCP to DALI4 units
Head-End ServerRack-mount, GRMS Management SW1 unit

System Architecture

The head-end server was installed in the IT room on the ground floor, running the GRMS management software for monitoring, reporting, and integration. Four floor gateways — one per floor — connected to the server over the hotel's TCP/IP backbone using Modbus TCP. On each floor, the gateway communicated with all room RCUs via the DALI bus, forming a clean star-of-stars topology. Each RCU was mounted behind a ceiling access panel in the room, controlling lighting circuits, the curtain motor, and interfacing with sensors and the touch panel. The head-end server exported a Modbus TCP interface to the building's BMS, allowing central monitoring of room occupancy and energy consumption.

Results & ROI

32%

Energy savings vs traditional system

40%

Installation time reduced (pre-commissioned RCUs)

4.7 / 5

Guest satisfaction score

18 months

Payback period

Client Testimonial

“HotelGRMS understood our vision from day one. They delivered a system that feels premium to our guests but fit comfortably within our budget. The pre-commissioned RCUs saved us weeks on site, and the energy savings have been exactly as promised.”

— General Manager, Dubai Boutique Hotel

Project Gallery

RCU Cabinet installation at Dubai Boutique Hotel
Touch Panel installed in guest room

Similar project in mind? Let's talk.

Tell us about your project — room count, location, and requirements — and receive a preliminary budget breakdown within 24 hours.

Chat on WhatsApp